Property Preservation, HUD Regulations and REO Property Preservation




South Carolina Property Preservation Guidelines

April 29, 2008 · Filed Under HUD Guidelines · Comment 

South Carolina Property Preservation Guidelines

is sponsored by

Contractor Support Services
Download PDF



South Carolina Property Preservation Guidelines

Copyright 2008, Gulf Thunder Corporation

This Publication Has Specific Re-Print Permissions

Maximum Allowable Cost Per Property

Note: If a property is located in a state where winterization is required,
and the property has hot water heat, add $250/unit

1 Unit $1100

2 Units

$1250

3 Units

$1400

4 Units

$1550

Lock Change/Securing Service Cost Schedule

Nationwide

Secure One Door $40

Secure Pool (Sq. Ft. Amt.)

$2.05

Maximum Secure Pool

$1050

Secure Hot Tub, Jacuzzi, Spa

$55

Maximum Allowable for Lock Change/Securing

$350

 

Debris Removal Service Schedule

Labor, fees, transportation, fuel, mileage, etc. included

Debris Removal Per Cubic Yard $55
Debris Removal Maximum for 1 Unit: 12 cu yd. $660
Debris Removal Maximum for 2 Units: 15 cu yd. $825
Debris Removal Maximum for 3 Units: 18 cu yd. $990
Debris Removal Maximum for 4 Units: 21 cu yd. $1155
Large Appliance Removal $30
Vehicle Removal $235
Pest Infestation $75
Tire Removal per tire up to a maximum of six tires
$15

 

Yard Maintenance Cost Schedule

 

Initial cut up to 10,000 sq ft. $85
Initial cut 10,001 sq ft to 15,000 sq ft $105
Re-cut up to 10,000 sq ft $80
Re-cut 10,001 sq ft to 15,000 sq ft $100
Trim Shrubs $30

 

Winterization Service Cost Schedule

Winterize from October 1 through March 31.

Dry Heat 1 Unit $75
Dry Heat Additional Units $50
Steam Heat 1 Unit $155
Steam Heat Additional Units $90
Wet/Radiant Heat 1 Unit $460
Wet/Radiant Heat Additional Units $230
Snow Removal $0

Local Variations

 

HUD Marketing and Management Contractor – M&M

Harrington, Moran, Barksdale, Inc.
5350 77 Center Drive, Suite 200
Charlotte, NC 28217
Phone: (704) 522-3590; Toll Free: (866) 316-4624
Fax: (704) 565-6852
Email address: Charlotte@hmbireo.com
Website: www.hmbireo.com



Georgia Property Preservation Guidelines

April 27, 2008 · Filed Under HUD Guidelines · Comment 

Georgia Property Preservation Guidelines
is sponsored by
Bama REO
and
Digital Field Services, LLC
Download PDF



Georgia Property Preservation Guidelines

Copyright 2008, Gulf Thunder Corporation
This Publication Has Specific Re-Print Permissions

Maximum Allowable Cost Per Property

Note: If a property is located in a state where winterization is required,
and the property has hot water heat, add $250/unit

1 Unit $1100

2 Units

$1250

3 Units

$1400

4 Units

$1550

Lock Change/Securing Service Cost Schedule

Nationwide

Secure One Door $40

Secure Pool (Sq. Ft. Amt.)

$2.05

Maximum Secure Pool

$1050

Secure Hot Tub, Jacuzzi, Spa

$55

Maximum Allowable for Lock Change/Securing

$350

 

Debris Removal Service Schedule

Labor, fees, transportation, fuel, mileage, etc. included

Debris Removal Per Cubic Yard $50
Debris Removal Maximum for 1 Unit: 12 cu yd. $600
Debris Removal Maximum for 2 Units: 15 cu yd. $750
Debris Removal Maximum for 3 Units: 18 cu yd. $900
Debris Removal Maximum for 4 Units: 21 cu yd. $1050
Large Appliance Removal $140
Vehicle Removal $205
Pest Infestation $113
Tire Removal per tire up to a maximum of six tires
$15

 

Yard Maintenance Cost Schedule

Grass Cut Season: April 1st to October 31st

Initial cut up to 10,000 sq ft. $85
Initial cut 10,001 sq ft to 15,000 sq ft $105
Re-cut up to 10,000 sq ft $80
Re-cut 10,001 sq ft to 15,000 sq ft $100
Trim Shrubs $30

 

Winterization Service Cost Schedule

Winterization required October 1st to March 31st

Dry Heat 1 Unit $100
Dry Heat Additional Units $50
Steam Heat 1 Unit $150
Steam Heat Additional Units $90
Wet/Radiant Heat 1 Unit $460
Wet/Radiant Heat Additional Units $230
Snow Removal $0

Local Variations

None

HUD Marketing and Management Contractor – M&M

PEMCO, LTD
Piedmont Center
3525 Piedmont Road, N.E.
Bldg. 5, Suite 310
Atlanta, Georgia 30305
Phone: (404) 995-7111
Toll free: (800) 881-9260
Fax: (404) 995-7110
Website: http://www.hud.gov/utilities/intercept.cfm?http://www.hudpemco.com/
Preservation and Protection requests and extension of time requests for Georgia properties should be sent to:

PEMCO, LTD
Attn: Nancy Ishii, Mortgagee Compliance Coordinator
Phone: (808) 949-0414, ext. 105
Fax: (808) 955-0414
Email address: http://www.hud.gov/utilities/intercept.cfm?mailto:gamortgagee@pemco-limited.com

Pennsylvania Property Preservation Guidelines

April 27, 2008 · Filed Under HUD Guidelines · Comment 

Pennsylvania Property Preservation Guidelines

is sponsored by

Contractor Support Services
Download PDF



Pennsylvania Property Preservation Guidelines

Copyright 2008, Gulf Thunder Corporation

This Publication Has Specific Re-Print Permissions

 

Maximum Allowable Cost Per Property

Note: If a property is located in a state where winterization is required,
and the property has hot water heat, add $250/unit

 
1 Unit $1400

2 Units

$1550

3 Units

$1700

4 Units

$1850

Lock Change/Securing Service Cost Schedule

Nationwide

 
Secure One Door $40

Secure Pool (Sq. Ft. Amt.)

$2.05

Maximum Secure Pool

$1050

Secure Hot Tub, Jacuzzi, Spa

$55

Maximum Allowable for Lock Change/Securing

$350

 

Debris Removal Service Schedule

Labor, fees, transportation, fuel, mileage, etc. included

 
Debris Removal Per Cubic Yard $50
Debris Removal Maximum for 1 Unit: 12 cu yd. $600
Debris Removal Maximum for 2 Units: 15 cu yd. $750
Debris Removal Maximum for 3 Units: 18 cu yd. $900
Debris Removal Maximum for 4 Units: 21 cu yd. $1050
Large Appliance Removal $50
Vehicle Removal $210
Pest Infestation $110
Tire Removal per tire up to a maximum of six tires
$15

 

Yard Maintenance Cost Schedule

 

 
Initial cut up to 10,000 sq ft. $95
Initial cut 10,001 sq ft to 15,000 sq ft $115
Re-cut up to 10,000 sq ft $90
Re-cut 10,001 sq ft to 15,000 sq ft $110
Trim Shrubs $35

 

Winterization Service Cost Schedule

Winterize from November 1 through March 31 only. However, heat system will remain in shut down mode. Utilities are to remain off unless required to operate a sump pump.

 
Dry Heat 1 Unit $75
Dry Heat Additional Units $50
Steam Heat 1 Unit $155
Steam Heat Additional Units $90
Wet/Radiant Heat 1 Unit $460
Wet/Radiant Heat Additional Units $230
Snow Removal $45

Local Variations

Pennsylvania
Boarding is pre-approved for the following zip codes:
17509 17512 17516 17517 17518 17527 17532 17536 17547 17550 17560 17563 17565 18101 18102 18103 18115 18117 19013 19023 19320 19335 19380 19401

 

 

HUD Marketing and Management Contractor – M&M

Hooks, Van Holm, Inc.
1005 West 9th Avenue, Suite A
King of Prussia, PA 19406
Phone: (866) 851-5482 or (610) 491-2420
Fax: (610) 491-2479
Email address: info@hooksvanholm.com
Website: www.HooksVanHolm.com

Preservation and Protection requests and extensions of time can be sent to the above address or to: PandP@hooksvanholm.com or extensions@hooksvanholm.com

 

Next Page »